Dieselbikes Logo Image

"New England Mountain Bike News & Trail Information"
Google
Web Dieselbikes.com
HOME NEWS DIESEL TRAILS TECH MEDIA LINKS EVENTS GEAR

MEMBERSHIP

Lynn Woods Trail Maintenance - 2009

Project Location: Lynn Woods

Project #: LYW20090912

Date: 09.12.2009

 

On Saturday September 12 the third 2009 Lynn Woods trail project was completed with great success. We were able to complete 5 separate projects regardless of the inclement weather and enhance the hill climb by adding a few features.

 

The lower half of the Wolf Pit’s Trail climb (below Showtime) was the site our trail work. This was phase 3 of repairing the trail climb that has been broken down into multiple trail days over the past 5 years. Our goals were to redirect water that still trickles down the lower climb section and greatly reduce the undercutting of the trail thread caused by additional water run off and user traffic.

 

Regardless of heavy rain all of the volunteers worked diligently to ensure each of the 5 projects were completed 100%. First we enlarged and lengthened the drainage ditch for the 10” PVC pipe installed 5 years ago to keep it from frequently clogging. Next we dug a secondary ditch down hill of the PVC 10 since some water was draining under the rocks and coming back out onto the trail. Next we built a rock bridge on a trail connect just upstream of the PVC pipe. This will allow riders to hit the technical challenges without needing to cross through the water stream. We then closed off a short section of trail that has become more and more of a drainage line over the years. Last we rock armored the increasingly large undercut that has occurred due to water runoff and user traffic. This rock armoring has essentially created a sweet berm that can be used maintain speed down the hill or assist in climbing without causing accelerated erosion.

 

As usually, this was another large project and everyone worked hard to get the job done. I want to extend my personal thanks to each individual (listed below) that helped complete this project. The amount of work completed by the volunteers was backbreaking, but the end result was fantastic! I look forward to see everyone again in future trail builds and or maintenance projects.

 

Simon - Somerville, Pete - Lynn, Carol - Somerville, Nate - Somerville, Tina - Lynn, Frank - Lynn,

Greg & Family – Medford

 

.

Trail Work Crew

 

 

 

 

[News] [Diesel] [Trails] [Tech] [Media] [Links]

[Gear] [BlogSpot] [Events] [Rides] [Reports] [Music] [Film]

---------------------------------------------------------------------------------------------

Homepage - Contact Us

Use of this website signifies your agreement to our Legal Terms

Copyright 2004 ~ 2011